工程施工方案英文Method statementWord文档下载推荐.docx
- 文档编号:6522193
- 上传时间:2023-05-06
- 格式:DOCX
- 页数:27
- 大小:28.46KB
工程施工方案英文Method statementWord文档下载推荐.docx
《工程施工方案英文Method statementWord文档下载推荐.docx》由会员分享,可在线阅读,更多相关《工程施工方案英文Method statementWord文档下载推荐.docx(27页珍藏版)》请在冰点文库上搜索。
1.1.2.2SubgradeExcavation
1)Excavationofunsuitablematerialsandetc.
Usingexcavator,loaderanddumptrucksforremovingunsuitablematerialswhichwillbedisposedatplacedesignatedbytheEmployer.
2)Excavationworks
Excavationwillbecarriedoutsectionbysection.
Thecommonexcavationshallbeperformedbyexcavator,loaderanddumptruck.Asforrockexcavation,acrawlermounteddrillingmachinewithaircompressorwillbeemployedforshallowholeblastingoperationtosplitandloosetherock,theexcavatedmaterialswillberemovedanddisposedbydumptruck.
Theprocessflowofcommonexcavationisasfollows:
Demarcatingtheexcavationlineaftersurvey→originalgroundclearance→mobilizingequipmentintoposition→excavationanddisposal
Theprocessingsequenceofrockexcavationbyblastingoperation:
Surfaceclearance→drillingmachineinposition→drillingbydrillingmachine→chargingthehole→blasting→inspectionandclearance
Sincetherockexcavationoftheprojectis22143m3involume,someexperiencedandcompetentexpertswillbeassignedforconductingandsupervisingtheentireblastingoperation,soastoensurethesafetyandefficiency.
1.1.2.3SubgradeFilling
1)EarthFillingworks
Fillinginhorizontallayersandcompactioninlayersshallbeusedinconstruction.Thethicknessofeachloosefillinglayer.Fillingmaterialshallbedeliveredtothesiteby16m3dumptrucksandleveledfirstlybybulldozersandthenbygraderforpreciselevelingafteritisfilledinfillingarea,andthenrolledwithvibrationandstaticcompactionbyusingsingle-drumvibratoryroadrollersandstaticrollersrespectively.Smallcompactorshallbeusedwhererollercannoreach.
Duringconstruction,thicknessforeachlayer,leveling,watercontent,andcompactionscopeandnumberofcompactionshallbecontrolledstrictly.OnlywhenthepreviousworkisapprovedandacceptedbytheEngineerafterinspection,thenfillingofnextlayercanbemade.Pileupfillingbydumptruckoroverfillingisnotallowed.Thespoilisrequiredtobeleveledandcompactedtopreventenvironmentalcontamination.
Theconstructionworksshallbeproperlyarrangedtakingdueaccountofrainyseason,soastoavoidworkinginrainydays.
Flow-chartforfillingworksofsubgradeearthwork:
Inspectionandaccepted
2)RockFilling
Rockfillshallbeusedforfillinginsoftgroundareas,asforculvertsandwallbackfilling,rockfillingmaterialtobeusedshallbeselected.Siltandsoftmaterialswillberemovedbeforefilling.
Constructionmethodoffillingandcompactinginlayersshallbeadoptedforrocksubgrade.Thicknessoffillingandcompactionforeachlayershallbecontrolledwithin250mm.
Flow-chartforrockfillingofsubgrade:
Unqualified
Constructionmethod:
Excavatorsanddumptrucksshallbeusedforloadingandtransportation,bulldozersinlargehorsepowershallbeusedforlevelingandgrading,jointfillingbymanuallabor,andsingle-drumvibratingrollersandsteelrollersshallbeusedforcompaction.
2.2ConstructionMethodforCementstabilizedNaturalGravelSubbaseCourse
1)Constructionplan
Mixtureusedforcementstabilizednaturalgravelsub-baseinthicknessof250mmshallbemixedatmixingplant,andpaverwillbeusedforsubbaselayinginoneoperation.Tocoverthefullwidth,pavingshallbeperformedbypaverintwotimes.Andcompactionshallbedoneusingavibratingrollerandatyredroller,theworkmanshipofshoulderwithsubbasematerialisassameasthatforcementstabilizednaturalgravelsubbase.
2)ConstructionFlow-chart
(i)flow-chart:
Cementbatching&
delivery
Commissioningofplant
Gravelbatching&
convey
Mixing
Materialtest
Discharge
Materialpreparation
Water
Sampling
(ii)Flow-chartforpavingandcompaction:
MixtureTransportation
Curing&
Trafficcontrol
JointTreatment
compaction
Paving
Settingout
Surfacepreparation
preparion
Addwaterwhennecessary
Trialsectionandsummary
ApprovedbytheEngineerforconstruction
3)Controlonmajorworkmanship
(i)Preparations
Theacceptanceinspectiononsubgradeshallbecarriedoutinaccordancewiththespecificationsandrelatedqualityacceptancestandards,thelevelness,width,transversegradeandcompactnessandwatercontentshallmeettherequirementsofspecifications.Surfaceshallbefreeofdustanddebris,anditshallbekeptwetbywateringbeforeconstruction.
(ii)Settingout
Theroadcenterlineshallbereinstated.Stakesshallbesetupat10mintervalsonstraightsectionsandat5mintervalsincurves,andreferencestakesshallbesetup,too.Levelsurveyshallbecarriedoutforlevelcontrol.
(iii)MaterialsPreparations
ComponentmaterialsshallbepreparedasperthemixdesignapprovedbytheEngineerpriortoconstruction,andwhichcannotbechangedwithoutapprovalbytheEngineer,soastokeepstability.
(iv)Mixing
Thecomponentmaterialsofcementstabilizedgravelforsub-baseshallbemixedatmixingplants.ThemixingwillnotstartuntilthemixproportionsatisfythedesignrequirementandapprovedbytheEngineer.Aspecificpersonwillbeassignedforcontrollingthecementandwaterproportioningduringmixingoperation.Thereadymixedmixturemustberightinbatching,wellmixed,thegrainsizeofaggregateandgradingrangeshallmeetthemixingdesign.
(v)Transportation
Dumptrucksshallbeusedfortransporting.Haulagecapacitymustmatchwithmixingcapacity.Inordertoensureacontinuoussupply,moredumptrucksshallbedeployedforthistask.
(vi)Paving
Apaverwithanautolevelingdeviceandvibratingcompactionfunctionshallbeemployedforthejob.Loosecoefficientshallbeobtainedfromtrialsectionandspeedofpavingshallbecontrolledinconformitywithrateofmixingandsupplyofthestabilizedgravel.Thesegregationofthemixtureifanyafterpavingwillbedealtwithbymanuallabor.
(vii)Compaction
Thecompactionplanshallbeworkedoutaccordingtothewidthoftheroadandwidthandrangeoftheroller’swheels.Compactionshallbemadeundertheprincipleofbeginningwithlightcompactionfollowedbyheavycompaction,beingslowatstartandspeedingupgradually,andstartingatthelowestplacesbeforecompactionathigherplaces,andthecompactionshalloverlapwith1/2wheelwidthoverthepreviouscompactionrut.Therearwheelofrollershallrolloverthejointbetweentwostrips.Surfaceshallbekeptwetallthetime,onwhichwatershallbesprayedifwaterisvaporizedtoofast.Itisnotallowablethattherollerturnsaroundsharplyorbrakessuddenlyoncompletedsectionsorsectionswhichisbeingcompacted.Thecompactnessshallbecheckedpromptlyaftercompaction.Additionalcompactionshallbeperformedshouldthecompactnessisfoundinsufficient.Thetimeforcompactionshallbecontrolledtakingdueaccountthenatureofcementstabilizedmacadam,thecompactionshallbecarriedoutbeforethefinalsetofcementandthecompactnessshallbemetwithoutremainingobviousruts.
(viii)JointTreatment
Immediatelyafterpavingandcompaction,alevelingrulershallbeusedtocheckthesmoothnessofthesurface.Straightandverticaltransversejointsshallbecutmanuallyandsomematerialsshallbeplacedoverthecutjointforthepurposeoftrafficpassing,andothersurplusshallbeclearedaway.Longitudinaljointsshallbeavoidedasmuchaspossible.Incasealongitudinaljointisnotavoidable,itshallbecutstraightandvertically.
(ix)Trafficcontrol
Aftercompactionofsubbasewhichmeetvariousindexupontestandinspection,notrafficotherthanconstructionequipmentshallbeallowedtorunover.
4)Measuresforensuringthequalityofsub-base
(i)ThepreparationofrawmaterialsshallbecarriedoutstrictlyinaccordancewithspecificationsandasinstructedbytheEngineer,andproportionofmaterialsshallbewellcontrolled.
(ii)IncompliancewiththespecificationsandtheinstructionsbytheEngineer,andself-inspectionshallbemadebythecontractor.
(iii)WorksshallbecarriedoutinatrialsectionwiththemethodapprovedbytheEngineerpriortopracticalconstruction,whichwillbeconductedwiththeloosepavingfactor,optimumwatercontent,thearrangementofequipmentandmeansofconstructiongainedfromthepracticeinthetrialsection.
(iv)Thesurfaceshallbecleanedfreeofdustanddebrisbeforeconstruction,anditshallbekeptmoistbywatering.However,theworksshallbestoppedifitrains.
(v)Specificpersonshallbeassignedatthemixingplantforcontrollingandmonitoringproportionofcementandwatercontentsothatabnormityshallbeadjustedpromptlyifitoccurs.
(vi)Pavingthicknessshallbewellcontrolledandcompactionmustbemadefully,soastoensurethatcompactionthicknessmeetsrequirementsofspecifications.Thecompactedareashallbecoveredwithgeotextileaftercompaction.
(vii)Inspectionshallbeperformedonlevelness.
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 工程施工方案英文Method statement 工程施工 方案 英文 Method