神华黄骅港电厂供水工程技术标书
神华黄骅港电厂供水工程
(技术标书)
投标文件
项目编号SHIL08010331
天津港保税区海加利工程有限公司
二ΟΟ八年五月
目录··································································································1
一、法人资格证明··············································································3
1.1法人资格证明书·······························································································4
二、法人授权委托书·····························································································5
2.1法人授权委托书··································································································6
三、施工组织设计·······························································································7
3.1本工程施工方案及施工组织设计·······································································8
3.1.1编制依据·································································································9
3.1.2工程概况与规模······················································································9
3.1.2.1工程名称···················································································9
3.1.2.2建设地点···················································································9
3.1.2.3厂区自然条件············································································9
3.1.2.4工程规模···················································································9
3.1.3施工组织机构························································································11
3.1.4总体施工工序························································································14
3.1.5主要施工方案························································································15
3.1.5.1施工测量·················································································15
3.1.5.2供水管道系统施工····································································16
3.1.5.3消除质量通病的控制措施···························································18
3.1.6主要施工机械的配备···············································································20
3.2本工程计划开、竣工日期和施工进度表···························································25
3.2.1进度计划编制原则·················································································26
3.2.2里程碑进度····························································································26
3.2.3施工二级进度计划·················································································27
3.2.4图纸交付进度要求·················································································29
3.2.5保证进度的措施·····················································································29
3.3劳动力计划······································································································30
3.3.1劳动力计划表························································································31
3.3.2劳动力曲线···························································································31
3.3.3各专业工程施工人员安排表··································································32
3.3.4项目经理部作息时间安排······································································32
3.3.5人员培训·······························································································33
3.4临时设施布置及临时用地表············································································37
3.4.1临时设施布置·······················································································38
3.4.2临时用地表···························································································41
3.5安全体系········································································································43
3.5.1安全管理目标·······················································································44
3.5.2安全管理体系·······················································································45
3.5.3安全控制措施·······················································································52
3.5.4文明施工管理·······················································································66
3.6质保体系·········································································································70
3.6.1质量目标·······························································································71
3.6.2质量标准·······························································································71
3.6.3质保体系·······························································································72
3.6.4质保大纲·······························································································73
3.6.5质保计划·······························································································74
3.6.6质保措施·······························································································82
3.6.7质量通病的控制措施·············································································84
3.7环保卫生体系··································································································85
3.7.1环境卫生体系的建立·············································································86
3.7.2环境卫生管理措施·················································································86
3.7.3环境管理措施························································································88
3.7.4其它影响·······························································································90
3.8物资管理体系·································································································91
3.8.1物资管理概述·······················································································92
3.8.2物资管理机构设置················································································92
3.8.3物资采购管理·······················································································92
3.8.4贮存区域管理·······················································································94
3.8.5物资管理承诺·······················································································94
3.9其它················································································································95
3.9.1施工本工程的优势················································································96
3.9.2与其他单位配合····················································································96
3.9.3企业形象设计及实施方案······································································98
四、附表··········································································································106
4.1组织机构图·····································································································107
4.2主要人员简历表······························································································108
4.3施工机械配置一览表·······················································································113
4.4实验、测量及质检仪器一览表·········································································115
4.5近三年的建筑业绩···························································································116
4.6劳动力计划表··································································································118
4.7工程进度计划表·······························································································119
4.8主要材料用量表·······························································································121
1.1法定代表人资格证明书
单位名称:
天津港保税区海加利工程有限公司
地址:
天津港保说区华夏工贸城203-11
姓名:
宋富锦性别:
男年龄:
57职务:
总经理
系天津港保税区海加利工程有限公司法定代表人,特此证明。
投标单位:
(盖章)
日期:
2008年4月22日
4
2.1法人代表授权委托书
致:
神华国际贸易有限责任公司和神华黄骅港务有限责任公司
委托单位:
天津港保税区海加利工程有限公司
法人代表:
宋富锦性别:
男年龄:
57
工作单位及职务:
天津港保税区海加利工程有限公司、总经理
住址:
天津港保说区华夏工贸城203-11
受委托人:
宋长金性别:
男年龄:
53
工作单位及职务:
天津港保税区海加利工程有限公司、副总经理
住址:
河北省沧州市渤海新区
我系天津港保税区海加利工程有限公司的法人代表,现委托本公司的副总经理宋长
金同志为我的代理人,并以我的名义参加“神华黄骅港电厂供水工程”(项目编号:
SHIL08010331)的投标活动及签订工程承包合同。
受托人所签署的一切有关文件,我均
予以承认。
特此委托。
受托人无转委权
投标人:
(盖章)
授权人:
(法定代表人签字)
被授权的代理人:
(签字并盖章)
日期:
2008年4月22日
神华黄骅港电厂供水工程
施工组织设计
天津港保税区海加利工程有限公司
二ΟΟ八年五月十三日
3.1本工程施工方案及施工组织设计
3.1.1编制依据
(1)神华黄骅港电厂供水工程招标文件
(2)黄骅港电厂供水工程室外给水管道布置图
(3)室外给排水管道施工规范
(4)市政道路施工规范
(5)《地基与基础工程施工及验收规范》GBJ202-83
(6)《建筑安装工程质量检验评定统一标准》GBJ300-88
(7)《建筑工程质量检验标准》GBJ301-88
(8)《建筑机械使用安全技术规程》JGJ33-86
(9)《施工现场临时用电安全技术规格书》JGJ46-88
(10)《建筑施工安全检查标准》JGJ59-99
(11)《硅酸盐、普通硅酸盐水泥》GB175-85
(12)《室外硬聚氯乙烯给水管道工程施工及验收规程》CECS18:
90
(13)《给水排水管道工程施工及验收规范》GB50268-97
(14)《建设工程项目管理规范》(GB/T50326-2001)
(15)《建设工程文件工程归档整理规范》(GB/T50328-2001)
(16)《砌体工程施工质量验收规范》(GB/T50203-2002)
3.1.2工程概况及规模
3.1.2.1工程名称
神华黄骅港电厂供水工程
3.1.2.2建设地点
该工程位于河北省沧州市区以东约100km的黄骅港生产区,南边界在电厂北围墙,北边至二期堆场前方区,西边至生产区生产供水贮水池
3.1.2.3厂区自然条件
(一)地质条件
(1)该场地原为海域,经人工吹填形成陆地,吹填厚度约6米,场地15.5米深范围内地层主要为冲填土沉积形成的粉土、粉质粘土、淤泥质粘土层,真空预压形成陆地后建为厂区。
(2)场地地下水位埋深1.5—2.0m,地下水位的升降主要受大气降水及周围地表水体的影响。
根据场区勘测资料,地下水对混凝土有弱腐蚀性;对钢筋混凝土结构中的钢筋具有弱腐蚀性。
(3)未经建设地段,根据相关资料综合确定该场区场地土类型为软弱场地土,已经硬化场地和道路地段为坚硬土。
(二)气象条件
多年平均气压:
1014.0hPa
多年平均气温:
13℃
多年平均最高气温:
25.7℃
多年平均最低气温:
2.67℃
极端最高气温:
40.8℃
极端最低气温:
-19℃
平均相对湿度:
62%
多年年平均降水量:
580.8mm
年最大降水量:
1040.2mm
年最小降水量:
171.6mm
多年1日最大降水量:
225.2mm
三十年一遇10m高10分钟平均最大风速:
23.41m/s
多年平均风速:
3.5m/s
主导风向:
夏季:
ESE;冬季:
NNW;全年:
SW;
基本风压:
50年一遇0.40kN/㎡
基本雪压:
50年一遇0.30kN/㎡
土壤冻结深度:
52cm
最大积雪厚度:
l5cm
3.1.2.4工程规模
神华黄骅港电厂供水工程其施工范围包括:
1350m的供水管道,主要工程量为:
(1) 原有地面面层连锁块拆除约1418m2
(2) 人工拆除地面碎石灰土层200m3
(3)人工拆除地面石灰土垫层370m3
(4)人工、机械挖沟槽土方2400m3
(5)铺设中粗砂垫层260m2
(6)钢管顶进直径600mm的30.5m
(7)钢管顶进直径400mm的11m
(8)预埋管直径600mm的35m、直径550mm的80m
(9)铺设DN400钢骨架增强塑料符合管100m
(10) 铺设DN350钢骨架增强塑料符合管1100m
(11)铺设DN200钢骨架增强塑料符合管130m
(12)铺设DN250钢骨架增强塑料符合管20m
(13) 安装室外消火栓6个
(14) 安装RVHX-200PN1.0Mp手动弹性座封闸阀2个
(15) 安装RVHX-250PN1.0Mp手动弹性座封闸阀1个
(16) 安装RVHX-350PN1.0Mp手动弹性座封闸阀7个
(17)安装公称直径400mm法兰式水表组成(有旁通、止回阀)1套
(18)砌筑矩形水表井(5.0m*2.25m井室内高1