1、电厂626MW机务项目划分表中英文版1、00H01原水系统设备及管道安装质量验收范围划分表raw water system equipment and piping installation quality acceptance scoping table工程编号project No.工程名称Project name性质property质量验收表编号Quality acceptance table No.单位工程Unit project分部工程Part work分项工程Itemwork检验批Inspection lot01原水预处理系统raw water pretreatment system
2、01原水预处理系统设备安装Raw water pretreatment system equipment installation02澄清设备安装Clarification equipment installation主控main02机械搅拌澄清池安装Mechanical agitation clarifier installation主控main表(table)4.4.505澄清池斜管安装Clarifier inclined tube installation 表(table)4.4.905加药设备安装Dosing equipment installation02混凝剂加药装置安装Coagu
3、lant dosing device installation表(table)4.3.1103次氯酸钠加药装置安装Sodium hypochlorite dosing device installation表(table)4.3.1104酸调节装置Acid adjusting device表(table)4.3.1105碱调节装置Alkali adjusting device表(table)4.3.1106其它设备安装Other device installation04管道混合器安装Pipe mixer installation表(table)4.4.2102原水预处理系统转动机械安装Raw
4、 water pretreatment system rotating equipment installation02泥浆排放泵安装Slurry drain pump installation02泥浆排放泵安装Slurry drain pump installationDL/T 5210.3表(table)4.3.25或(or)4.3.2804泥浆输送泵安装Slurry transfer pump installation 02泥浆输送泵安装Slurry transfer pump installation DL/T 5210.3表(table)4.3.25或(or)4.3.2805搅拌器安
5、装Stirrer installation01搅拌器安装Stirrer installation表(table)4.3.103原水预处理系统管道及支吊架安装 raw water pretreatment system piping and hangers installation01管道安装Piping installation05塑料管道安装Plastic piping installation表(table)4.3.1607不锈钢管道安装Stainless steel piping installation表(table)4.3.1808一般钢制管道安装Generate steel pip
6、ing installationDL/T 5210.5表(table)4.5.3 09特殊阀门安装Special valve installation主控main表(table)4.3.1902支吊架安装Hanger installation01一般钢制管道支吊架安装Generate steel piping hanger installationDL/T 5210.5表(table)4.5.2 02特殊管道支吊架安装Special steel piping hanger installation表(table)4.3.2004原水预处理系统分部试运Raw water pretreatment
7、 system part commissioning主控main02系统严密性试验System tightness test主控main01水压试验Hydrostatic Test主控main表(table)4.2.1503灌水试验Irrigation Test主控main表(table)4.2.1703设备单体试运Equipment monomer commissioning01机械搅拌澄清池试运Mechanical agitation clarifier commissioning主控main表(table)4.4.607混凝剂加药装置试运Coagulant dosing device c
8、ommissioning表(table)4.3.2908次氯酸钠加药装置试运Sodium hypochlorite dosing device commissioning主控main表(table)4.3.2910酸调节装置试运Acid adjusting device commissioning表(table)4.3.2911碱调节装置试运Alkali adjusting device commissioning表(table)4.3.2904转动机械试运Rotating machinery commissioning02泥浆排放泵试运Slurry drain pump commission
9、ing表(table)4.2.2305泥浆输送泵试运Slurry transfer pump commissioning表(table)4.2.2306搅拌器试运Stirrer commissioning表(table)4.3.2815混凝剂加药泵试运Coagulant dosing pump commissioning表(table)4.2.2416次氯酸钠加药泵试运Sodium hypochlorite dosing pump commissioning表(table)4.2.2405系统冲洗System flushing主控main01水冲洗Water flushing主控main表(t
10、able)4.2.1805原水泵房(补给水泵房)转动机械安装Raw water pump house(make-up water pump house)rotating equipment installation01原水泵(补给水泵)安装Raw water pump(make-up water pump) installation02原水泵(补给水泵)安装Raw water pump(make-up water pump) installationDL/T 5210.3表(table)4.22.203原水泵(补给水泵)试运Raw water pump(make-up water pump)
11、commissioningDL/T 5210.3表(table)4.22.302滤网冲洗水泵安装Filter flushing water pump installation02滤网冲洗水泵安装Filter flushing water pump installationDL/T 5210.3表(table)4.3.2503滤网冲洗水泵试运Filter flushing water pump commissioningDL/T 5210.3表(table)4.3.2606原水泵房(补给水泵房)设备安装Raw water pump house(make-up water pump house)
12、device installation01格栅安装Grille installation01格栅安装Grille installationDL/T 5210.3表(table)4.2102滤网安装Filter installation01滤网安装Filter installationDL/T 5210.3表(table)4.2103大型平板钢闸门安装Large flat steel gate installation01大型平板钢闸门安装Large flat steel gate installationDL/T 5210.3表(table)4.2104起重设备安装Lifting equipm
13、ent installation01电动单梁起重机安装Electric single girder crane installationDL/T 5210.3表(table)4.16.2102电动单梁起重机负荷试验Electric single girder crane load testDL/T 5210.3表(table)4.16.2203手动单梁起重机安装Manual single girder crane installationDL/T 5210.3表(table)4.16.2104手动单梁起重机负荷试验Manual single girder crane load testDL/T
14、 5210.3表(table)4.16.2207原水泵房(补给水泵房)管道及支吊架安装 raw water pump house(make-up water pump house)piping and hangers installation01管道安装Piping installation01管道外观检查及清理Piping appearance inspection and cleanDL/T 5210.5表(table)4.3.1-102阀门安装检查Valve installation and inspectionDL/T 5210.5表(table)4.3.1-303管道安装Piping
15、 installationDL/T 5210.5表(table)4.5.302支吊架安装Hanger installation01一般钢制管道支吊架安装Generate steel piping hanger installationDL/T 5210.5表(table)4.5.2 03系统严密性试验System tightness test01系统严密性试验System tightness testDL/T 5210.5表(table)4.4.9-1104系统冲洗System flushing01系统冲洗System flushingDL/T 5210.5表(table)4.4.9-142、
16、00H03除盐系统设备及管道安装质量验收范围划分表DM system equipment and piping installation quality acceptance scoping table工程编号project No.工程名称Project name性质property质量验收表编号Quality acceptance table No单位工程Unit project分部工程Part work分项工程Itemwork检验批Inspection lot03除盐系统设备及管道安装DM system equipment and piping installation01设备安装Equi
17、pment installation01离子交换设备安装Ion exchange equipment installation主控main01阴离子交换器安装Anion exchanger installation主控main表(table)4.6.102阳离子交换器安装Cation exchanger installation主控main表(table)4.6.103混合离子交换器安装Mixed-bed exchanger installation主控main表(table)4.6.104树脂储存罐安装Resin storage tank installation表(table)4.6.20
18、5树脂扑捉器安装Resin trap installation表(table)4.6.302酸碱设备安装Acid and alkali device installation01酸储存罐安装Acid storage tank installation主控main表(table)4.6.402碱储存罐安装Alkali storage tank installation主控main表(table)4.6.403酸计量箱安装Acid metering tank installation表(table)4.6.504碱计量箱安装Alkali metering tank installation表(ta
19、ble)4.6.505酸喷射器安装Acid ejector installation表(table)4.6.606碱喷射器安装Alkali ejector installation表(table)4.6.607酸雾吸收器安装Mist absorber installation表(table)4.6.705其它设备安装Other device installation07大气式除二氧化碳器安装Atmospheric carbon dioxide removal device installation表(table)4.5.708储气罐安装Storage tank installation表(ta
20、ble)4.3.1009填料安装packing installation主控main表(table)4.4.1310石英砂过滤器安装Quartz sand filter installation表(table)4.6.111活性炭过滤器安装Activated carbon filter installation表(table)4.6.102转动机械安装Rotating machinery installation02除二氧化碳风机安装Carbon dioxide removal blower installation01除二氧化碳风机安装Carbon dioxide removal blowe
21、r installation表(table)4.3.603罗茨风机安装Roots blower installation01罗茨风机安装Roots blower installation表(table)4.3.705酸碱输送泵安装Acid and alkali pump installation01酸输送泵安装Acid pump installation表(table)4.3.202碱输送泵安装Alkali pump installation表(table)4.3.210再生水泵安装Regeneration pump installation02再生水泵安装Regeneration pump
22、installationDL/T5210.3表(table)4.3.25或(or)表(table)4.3.2817锅炉上水泵安装Boiler feeding water pump installation02锅炉上水泵安装Boiler feeding water pump installationDL/T5210.3表(table)4.3.25或(or)表(table)4.3.2818除盐水输送泵安装DM water pump installation02除盐水输送泵安装DM water pump installationDL/T5210.3表(table)4.3.25或(or)表(table
23、)4.3.2819凝结水精处理冲洗水泵安装Condensate Polishing flushing water pump installation02凝结水精处理冲洗水泵安装Condensate Polishing flushing water pump installationDL/T5210.3表(table)4.3.25或(or)表(table)4.3.2820废水泵安装Wastewater pump installation02废水泵安装Wastewater pump installationDL/T5210.3表(table)4.3.25或(or)表(table)4.3.2821中
24、间水泵安装Booster pump installation02中间水泵安装Booster pump installationDL/T5210.3表(table)4.3.25或(or)表(table)4.3.2822清水泵安装Clean water pump installation02清水泵安装Clean water pump installationDL/T5210.3表(table)4.3.25或(or)表(table)4.3.2823反冲洗水泵安装Backwash water pump installation02反冲洗水泵安装Backwash water pump installat
25、ionDL/T5210.3表(table)4.3.25或(or)表(table)4.3.2803管道及支吊架安装Piping and hanger installation01管道安装Piping installation02衬塑管道安装Lining Plastic piping installation主控main表(table)4.3.1404塑料管道安装Plastic piping installation表(table)4.3.1605不锈钢管道安装Stainless steel piping installation表(table)4.3.1806一般钢制管道安装Generate s
26、teel piping installationDL/T5210.5表(table)4.5.307特殊阀门安装Special vlave installation主控main表(table)4.3.1902支吊架安装Hanger installation01一般钢制管道支吊架安装Generate steel piping hanger installationDL/T5210.5表(table)4.5.204分部试运Commissioning part主控main02系统严密性试验System tightness test主控main01水压试验Hydrostatic Test主控main表(
27、table)4.2.1502气压试验Air pressure test主控main表(table)4.2.1603灌水试验Irrigation Test主控main表(table)4.2.1704转动机械试运Rotating machinery commissioning02除二氧化碳风机试运Carbon dioxide removal blower commissioning表(table)4.3.2603罗茨风机试运Roots blower commissioning表(table)4.3.2605酸输送泵试运Acid pump commissioning表(table)4.3.2306碱输送泵试运Alkali pump commissioning表(table)4.3.2308除盐水输送泵试运DM water pump commissioning表(table)4.3.2311再生泵试运Regeneration pump commissioning表(table)4.3.2312锅炉上水泵试运Boiler feeding water pump commissioning表(table)4.3.2313废水泵试运Wastewater pump commissioning表(table)4.3.2314中间水泵试运Booster pump commissioning表(tab